中文字幕一区二区波多野结衣|亚洲中文字幕色欧另类欧美|国产伦一区二区三区高清|日韩中文高清在线专区

Brick making machine industry NEWS

Your location:HOME > Information dynamic  > News > Brick making machine industry

How is the maintenance and upkeep of the vacuum extruder?

source:m.rainbowbackdropindia.com         Release time:2024-06-25 Return list
    Various problems may occur during the use of vacuum extruders, which can delay our working time. In order to avoid such frequent problems, we need to pay more attention to the maintenance and upkeep of the equipment in our daily lives.
    1. Before starting the vacuum extruder, check if there are any debris in each part of the machine, clean the debris, and then start the machine to avoid equipment accidents.
    2. The use and maintenance of the reducer and vacuum pump of the vacuum extruder shall be strictly carried out in accordance with their instructions.
    3. When cleaning the grating, mud cylinder and other components of the vacuum extruder, the mud inside the vacuum extruder should be drained first. After stopping the machine, the upper box should be opened, and the main shaft should be pulled out for cleaning. It is strictly prohibited to start the machine for cleaning. When installing and disassembling, be careful to avoid damaging all components and pay attention to personal safety. Apply sealant on the joint surface after the vacuum extruder is cleaned and restored.
    4. When the vacuum extruder is shut down for a long time and not in use, it is necessary to clean, air dry, wipe, and oil the mud refining part of the vacuum extruder and all surfaces in contact with the mud to protect and seal it.
    5. The vacuum extruder uses a water circulation vacuum pump, which can use regular tap water. It is required to change the water once a week. If the raw material contains too much acid or alkali, it is required to change the water once a day.
    6. There are grease fittings on the outer side of the upper and lower gearboxes of the vacuum extruder, which are equipped for adding oil to the bearings. It is necessary to add grease once a week.
    7. When the operating temperature of the vacuum extruder equipment exceeds 30 degrees, it must be cooled by cooling water.
    8. When the external temperature is below zero degrees, the cooling water inside the water jacket must be emptied when the vacuum extruder equipment is not in use to prevent the water jacket from freezing and cracking.
    9. The vacuum extruder equipment is equipped with an overpressure shutdown system. If the extrusion pressure is too high, the machine should be stopped to check whether the mud material is blocking the mold or if the mud material has a low moisture content to avoid damaging the equipment.
甘肃省| 双辽市| 天峻县| 宿州市| 婺源县| 前郭尔| 常山县| 白玉县| 保山市| 临潭县| 桃园县| 红安县| 高邮市| 江西省| 馆陶县| 岫岩| 顺义区| 霍州市| 台东县| 乌拉特后旗| 竹北市| 沂水县| 茶陵县| 贺州市| 黄山市| 游戏| 河西区| 沾化县| 吴堡县| 昌宁县| 靖边县| 六安市| 修武县| 崇左市| 陆良县| 介休市| 汕头市| 新宾| 延寿县| 赞皇县| 永康市|